EICR testingnear you, at aprice you know first.
A qualified inspector at your property, the price fixed in writing before anyone books a van, and a full Electrical Installation Condition Report in your inbox within 48 hours. Landlords, letting agents, HMOs and homeowners.
Shows which nation’s rules apply to the property and how to book the nearest inspector.
The band for your property is confirmed in writing before we book. That is the figure on the invoice.
Your full EICR with the schedule of test results arrives as a PDF within 48 hours of the visit.
We arrange the visit with your tenant or collect keys, so you don’t have to be there.
If anything fails you get an itemised repair quote. Use us or anyone else you like.
What "near me" should actually get you
Searching for EICR testing near you tends to show whoever paid for the top spot, then a list of directory profiles. Distance is the least important part. These four things matter more, and you can check every one of them before anyone comes round.
Call 020 3386 1854 with the property postcode. We’ll tell you straight away whether we have an inspector covering that area and the first slot they can attend.
A qualified, registered inspector
Someone with an inspection and testing qualification who appears on a competent person register you can search yourself. Ask for the scheme number and look it up.
A price you know before the visit
A fixed band for your property size, in writing. A 4–5 bed house includes a second consumer unit, so no surprise extras on the day.
A slot that fits the tenancy
Before new tenants move in, inside your renewal window, and arranged with the people living there so the inspector actually gets in.
A report you can send on
A full EICR to BS 7671 with every circuit’s test results, ready for tenants, your letting agent, a licence application or the council.
The rules change at the border
Landlords in all four UK nations now need a periodic electrical inspection, but the law, the deadlines and the paperwork differ. Pick a nation, or enter the property postcode at the top of the page and it will be picked for you.
Welcome to
England
Private and social rented homes
England
Electrical Safety Standards in the Private Rented Sector (England) Regulations 2020, as amended in 2025.
A valid report in place before a new tenancy starts, then at least every 5 years, or sooner if the last report says so.
Existing tenants within 28 days of the inspection. New tenants before they move in. Prospective tenants within 28 days of asking in writing. The council within 7 days of a request.
Remedial work or further investigation within 28 days (or less if the report says so), then written confirmation to the tenant and council within 28 days.
Civil penalties of up to £40,000 per breach. The council can also do the work and recover the cost.
Private rented homes, HMOs and, since the 2025 changes, social housing (new tenancies from 1 December 2025, all tenancies from 1 May 2026).
Source: S.I. 2020/312 and S.I. 2025/1043 on legislation.gov.uk. Some councils also ask for the report with HMO or selective licence applications, so check with your council.
Welcome to
Wales
Croeso i Gymru
Wales
Renting Homes (Fitness for Human Habitation) (Wales) Regulations 2022, under the Renting Homes (Wales) Act 2016.
Electrical testing at least every 5 years by a qualified person, or sooner if the last report says so.
Give the contract-holder a copy of the latest electrical condition report within 14 days of the occupation date.
Without the testing and paperwork the home can be treated as not fit for human habitation, which affects the landlord’s position on rent and possession.
Landlords and agents must be registered or licensed with Rent Smart Wales.
Source: S.I. 2022/6 (W. 6) and the amending S.I. 2022/1076 (W. 227), which changed the copy deadline from 7 to 14 days.
Welcome to
Scotland
Fàilte gu Alba
Scotland
The Repairing Standard in the Housing (Scotland) Act 2006, with Scottish Government statutory guidance on electrical installations and appliances.
An EICR at least every 5 years, plus PAT testing of any portable appliances the landlord supplies.
A competent person. The guidance points to scheme-registered electricians or people with equivalent qualifications and insurance.
Keep the reports and give tenants a copy.
Tenants and councils can apply to the First-tier Tribunal (Housing and Property Chamber) if the Repairing Standard isn’t met.
Source: Scottish Government guidance on electrical safety in private rented property. Read the current guidance before relying on any single point.
Welcome to
Northern Ireland
Private tenancies
Northern Ireland
Electrical Safety Standards for Private Tenancies Regulations (Northern Ireland) 2024, made under the Private Tenancies Act (NI) 2022.
New tenancies from 1 April 2025. Tenancies that existed before then had to comply by 1 December 2025.
Inspection and testing by a qualified person at least every 5 years, or sooner if the report says so.
Give the tenant a copy of the report, and the council if it asks.
Remedial work within 28 days, or a shorter period if the report requires it.
Source: Department for Communities guidance on the 2024 Regulations.
Five numbers every landlord should know
These are the limits that matter. Miss one and the problem is the paperwork trail, not just the wiring.
Longest gap
Maximum time between inspections for a rented home, in every UK nation.
Repairs and copies
To finish remedial work, and to give existing tenants the report (England).
Wales copy deadline
To hand the contract-holder the latest report after they move in.
Council request
To send the council a copy once it asks (England).
Maximum penalty
The civil penalty ceiling in England since the 2025 amendment (was £30,000).
Get in the right lane
Most people booking an EICR near them fall into one of these six groups. The rules and the best timing differ for each.
Private landlords
A report before each new tenancy if the old one has run out, then every 5 years. Book a few weeks ahead of a re-let so remedials don’t delay the move-in.
HMO landlords
More rooms, more circuits, often two boards and communal areas. Councils commonly ask for a current EICR with mandatory or additional HMO licence applications.
Letting agents
One number for every property on the books: we arrange access with tenants, send the PDF to you and the landlord, and remind you before each renewal.
Social landlords
The England regulations now cover social housing too: new tenancies from 1 December 2025 and all existing tenancies from 1 May 2026.
Homeowners
Buying an older home, planning a renovation, after a flood or fire, or simply ten years since the last check. The IET recommends every 10 years for owner-occupied homes.
Holiday lets
Not covered by the tenancy rules, but owners still have fire safety duties, and insurers and booking platforms often ask for a current report.
Turn by turn: what happens on the day
An example visit to a three-bedroom house. Drag the slider or pick a step to see what the inspector is doing and what it means for you and your tenants.
Call or send the form with the postcode, property size and any access details. You get the fixed price in writing and a time slot. We contact the tenant if you’d like us to.
Booking
Price in writing, a time slot, access arranged with tenants.
Call or send the form with the postcode, property size and any access details. You get the fixed price in writing and a time slot. We contact the tenant if you’d like us to.
Arrival and walk-round
Photo ID, a look at every room, questions about previous certificates.
The inspector shows photo ID, looks at every room, the consumer unit and any outbuildings, and asks about previous certificates or known problems.
Visual inspection
Consumer unit, sockets, switches, signs of heat damage, earthing and bonding.
Sockets, switches, light fittings and the consumer unit are checked for damage, heat marks, missing covers, earthing and bonding to gas and water pipes.
Dead testing
Circuits off one at a time for continuity, insulation and polarity tests.
Each circuit is isolated in turn for continuity, insulation resistance and polarity tests. Expect the power to go off for short periods.
Live testing
Power back on to measure earth fault loop impedance and RCD trip times.
With the power restored, the inspector measures earth fault loop impedance and checks every RCD trips fast enough to protect someone from a shock.
Findings explained
Any codes talked through on site, dangerous faults made safe with your permission.
Any C1, C2, C3 or FI codes are explained in plain English. Anything dangerous is made safe on the spot, with your permission, before the inspector leaves.
Report delivered
PDF EICR with every result, plus an itemised quote if anything needs fixing.
The full PDF EICR with the schedule of test results, and an itemised repair quote if anything needs fixing. Send copies to tenants within 28 days.
Estimated time on site
How long an EICR takes depends on the number of circuits, not the floor area. These are typical times. Older installations, lots of outbuildings or locked rooms add to them.
An “EICR” that takes 30 minutes isn’t one. Testing every circuit properly takes hours, and the report should show a result for each circuit.
Reading the signs on your report
Every problem the inspector finds gets one of four codes. Tap a code to see what it usually means and what you have to do about it.
Danger present
Risk of injury right now.
C1: Danger present
- Exposed live conductors
- A socket or fitting burnt or broken open
- Wrong polarity at an accessory
The inspector should make it safe straight away, with your permission, before leaving.
Potentially dangerous
Could become a danger under fault conditions.
C2: Potentially dangerous
- No RCD protection where it’s needed
- Missing earthing or main bonding
- Signs of overheating at the board
Landlords must fix it within 28 days, or sooner if the report says so.
Further investigation
Something couldn’t be confirmed on the day.
FI: Further investigation
- A circuit that can’t be traced
- An unexplained test result
- Wiring hidden in an area that couldn’t be reached
Treat it like a C2: investigate within 28 days and record what was found.
Improvement recommended
Not dangerous, but below the current standard.
C3: Improvement
- An older consumer unit that still works safely
- No surge protection
- Minor labelling missing at the board
Worth planning for, especially at the next refurbishment. No legal deadline.
One C1, C2 or FI anywhere makes the whole report unsatisfactory. If that happens you’ll get an itemised quote for the repairs. There’s no obligation to use us, and once the work is done you get the written confirmation you need for your tenants and the council.
Fixed prices, whichever lane you're in
The price depends on the size of the installation. Find your property below. Whatever band you’re in, it’s confirmed in writing before the visit is booked.
Studio
Studio flats with one consumer unit.
1–3 bedrooms
Most flats and family houses.
4 bedrooms
Larger houses with one consumer unit.
5–6 bedrooms
Large houses with one consumer unit.
What's in the price
- Inspection and testing of every circuit, not a visual check
- The full EICR as a PDF within 48 hours, with the schedule of test results
- Arranging access with your tenant, or collecting keys
- Codes explained on the day and in writing
- An itemised repair quote if anything fails, with no obligation to use us
- A reminder before the next inspection is due
Each additional consumer unit or fuse board is £89.99. HMOs are from £250. In London, parking or the Congestion Charge may be added where it applies. Larger or unusual installations are quoted on the phone, in writing, before booking.
Price estimator
- The property is in London
- There's more than one consumer unit
- A garage, outbuilding or garden office has power
- A tenant lives there and needs contacting
Your price is confirmed in writing before the visit is booked.
Choosing someone local
Whoever you book, us included, these checks take five minutes and protect you if the council ever asks who did the inspection.
Check before you book
Search the register
The Registered Competent Person Electrical register (electricalcompetentperson.co.uk) lists electricians in England and Wales by name or postcode. Scheme operators such as NICEIC and NAPIT have their own searches.
Ask for the testing qualification
An inspection and testing qualification such as City & Guilds 2391, on top of being a qualified electrician.
Confirm the standard
The report should follow BS 7671, the IET Wiring Regulations, on the model EICR form.
Agree the extent and limits
What will be tested, and anything that can’t be (a locked loft, a sealed ceiling) should be written into the report.
Ask about insurance
Some councils give landlords a competence checklist that includes the inspector’s insurance. Ask before the visit, not after.
Signs to turn back
"Visual only" sold as an EICR
A walk-round with no testing isn’t an Electrical Installation Condition Report and won’t satisfy the regulations.
Half an hour for a whole house
Testing each circuit takes time. A very short visit usually means circuits were skipped.
No schedule of test results
A one-page “certificate” without readings for each circuit won’t hold up if the council asks questions.
Repairs pushed before you've seen the report
You should get the findings and an itemised quote first, then decide who does the work.
No name until the day
If you can’t get the inspector’s name and scheme details in advance, you can’t check them.
Quote checker
Got a quote from someone near you? Tick what it actually says. Anything missing is worth asking about before you book.
- Names the inspector and their scheme registration
- Says every circuit will be inspected and tested
- Promises a BS 7671 EICR with schedule of test results
- Gives a fixed total, including extra boards and outbuildings
- States when the report will arrive
- Keeps any repairs separate and optional
- Explains who arranges access with the tenant
- Ask for the inspector's name and scheme registration number.
- Make sure every circuit will be tested, not just looked at.
- Ask for a full EICR to BS 7671 with the schedule of test results.
- Get the total in writing, including any second board or outbuildings.
- Ask when you'll receive the report.
- Check that repairs are quoted separately and are your choice.
- Ask who arranges access with the tenant.
Our quotes cover all seven. Call 020 3386 1854 to compare.
How far to your next EICR?
Enter the date of your last report. The countdown markers show how close you are, and whether the next tenancy start date gets there first.
The interval is written on the report’s front page. An inspector can shorten it for an older installation.
We’ll work out the due date and when to book.
Before the inspector arrives
Most delays on the day come down to access. Tick these off and the road is clear.
Booking for a tenanted property? We can contact the tenant for you and agree a time that works.
Give at least 24 hours’ notice of the visit, and say the power will be off for parts of it.
The inspector needs to open it and work at it, so empty the cupboard or space around it.
Locked rooms can’t be tested and will be listed as a limitation on the report.
Keys for the garage, shed or garden office, and a safe way into the loft if circuits run there.
Fridges, freezers, alarms, home working, and anyone who relies on powered medical equipment.
The last EICR plus any installation or minor works certificates help the inspector compare.
Who lets the inspector in, and a number to call if they’re held up.
A space or permit details for the van, and pets kept out of the way of open boards.
After the report: take the right exit
Every EICR ends one of three ways, and each route has its own next steps for landlords in England. The deadlines in Wales, Scotland and Northern Ireland are similar but not identical.
Satisfactory
- Give existing tenants a copy within 28 days, and new tenants before they move in.
- Keep the report until the next inspection, and give a copy to the next inspector.
- Note the next due date: 5 years, or the shorter interval on the report.
Further investigation (FI)
- Have the investigation done within 28 days, or sooner if the report says.
- Fix anything it turns up within the same deadline.
- Send written confirmation to the tenant and council within 28 days of completing it.
Unsatisfactory (C1 or C2)
- Complete the remedial work within 28 days, or the shorter period on the report.
- Get written confirmation from the electrician that the work meets the standard.
- Send that confirmation, with the report, to the tenant and council within 28 days.
Repairs needed? You’ll get an itemised quote line by line, matched to the codes on your report. Compare it with anyone you like. There’s no pressure to use us.
Not a landlord? Worth a stop anyway
Owner-occupiers don’t have a legal deadline, but an EICR near you is worth booking at these points. The IET’s guidance suggests every 10 years for a home you live in, and on a change of occupier.
Buying or selling
A homebuyer’s survey doesn’t test the wiring. An EICR tells you whether that older house needs a rewire before you agree a price.
Before a renovation
Knowing the state of the circuits first helps a kitchen fitter or extension builder price the electrical work properly.
After a flood or fire
Water and heat damage wiring you can’t see. Get it tested before relying on it again; insurers often ask for a report.
Ten years on
If nobody has tested the installation in a decade, or you don’t know when it was last done, it’s due.
What we put in writing
No star ratings or borrowed logos here, just the commitments you can hold us to and the standards you can check.
Price fixed in writing
Your band and the exact figure are confirmed before we book. The invoice matches it.
Report within 48 hours
The full PDF EICR with the schedule of test results, emailed to you, your agent or both.
Access arranged
We contact your tenant and agree a time, or collect keys, so you don’t lose a day.
No pressure on repairs
An itemised quote if anything fails. You’re free to take it elsewhere.
Renewal reminder
We let you know before the next inspection falls due, so a re-let never catches you out.
A straight answer first
Questions about the rules or your report? Ring 020 3386 1854 before you book.
What every inspector holds
Ask for any of these before the visit. You’re entitled to check.
City & Guilds 2391 or an equivalent inspection and testing qualification
Works to BS 7671, the current IET Wiring Regulations
Photo ID shown on arrival
Calibrated multifunction test equipment
Scheme membership number on request, so you can check the public register
Questions people ask before booking
Can’t see yours? The answer is a phone call away.
£75 for a studio, £98.99 for 1–3 bedrooms, £109.99 for 4 bedrooms and £149.99 for 5–6 bedrooms, with each additional consumer unit at £89.99. HMOs are from £250. In London, parking or the Congestion Charge may be added where it applies. The price is confirmed in writing before we book.
Call 020 3386 1854 with the postcode and we’ll tell you the first slot an inspector can attend. If a tenancy is about to start, say so and we’ll work to that date. Tenant access can be arranged for you.
Typically 1.5 to 2.5 hours for a studio or 1-bed flat, 2.5 to 4 hours for a 2–3 bed house, 4 to 6 hours for a 4–5 bed house and five hours to a full day for an HMO. The PDF report follows within 48 hours.
For rented homes in England, Wales, Scotland and Northern Ireland, at least every 5 years, or sooner if the last report says so. In England a valid report must be in place before a new tenancy starts. For a home you own and live in, the IET recommends every 10 years or on a change of occupier.
In England, councils can impose civil penalties of up to £40,000 per breach since the 2025 amendment to the regulations. They can also arrange the remedial work themselves and recover the cost from the landlord.
C1 is danger present and needs immediate action. C2 is potentially dangerous and needs urgent repair. FI means something needs further investigation. Any C1, C2 or FI makes the report unsatisfactory. C3 is an improvement recommendation and doesn’t fail the report on its own.
Search the Registered Competent Person Electrical register at electricalcompetentperson.co.uk by name or postcode, or the scheme operator’s own register. Ask for their inspection and testing qualification, such as City & Guilds 2391, and check they work to BS 7671.
No. We can arrange access with your tenant or collect keys. The inspector needs to reach the consumer unit, every room, the loft if circuits run there, and any outbuildings with power.
For parts of the visit, yes. Circuits are switched off while the dead tests are done. Warn tenants about fridges, freezers, alarms and computers, and tell us in advance if anyone relies on powered medical equipment.
In England you must complete the remedial work or further investigation within 28 days, or any shorter period the report gives, then give written confirmation to the tenant and the council within 28 days of finishing. You’ll get an itemised repair quote from us, with no pressure to use it.
No. An EICR covers the fixed installation: wiring, consumer unit, sockets, switches and fixed equipment. PAT testing covers plug-in appliances. In Scotland landlords need both; in England PAT testing is good practice for any appliances you supply.
Holiday lets aren’t tenancies, so the private rented sector regulations don’t apply in the same way. Owners still have fire safety duties, though, and insurers and booking platforms often ask for a current report. Many owners follow the same 5-year cycle.
Set your destination
Rather talk it through?
- Price fixed in writing before booking
- PDF report within 48 hours
- Tenant access arranged for you
- Itemised repair quote, no pressure
- A reminder before the next one is due